The dam used to be here! To the left of the image is an 18" pipe that the Carmel River is currently being piped through. Soon I will do a painting from this vantage point..before the winter rains come gushing through!
Click on the image to see a larger view. The dam used to be here! To the left of the image is an 18" pipe that the Carmel River is currently being piped through. Soon I will do a painting from this vantage point..before the winter rains come gushing through!
0 Comments
This view and the one below represent the last three groupings (A,B, & C) of step pools under construction...approximately 6,000 boulders in all for the fifty-six (approx.) step pools! and a lot of precise engineering and team work. Quite a large onsite sculptural installation!
Click on the image below for a larger view. They have reached to the bottom of the dam and are preparing the site to finish the installation of the step pools. The Carmel River is currently being pumped through the 18" pipe running about halfway through the painting. The remains of the dam cement in the face of the canyon wall will stay so as to not create more instability in the rock face. Forever the dam will be memorialized in the land.
|
Author
|